More work on the potting alcove.
The latest plan is to install two hinged lattice doors at the end
(where you see one temporary lattice).
We'll attach planter boxes to the bottom of the doors
for sweet peas and other climbing foliage
that will swing open with the doors.
We're also working on the plans for setting up
the rain collection system to tie in to
the utility sink and drip watering system.
We also hope to create a solar heated outdoor shower.
Perfect for summertime fun!